261-270 of 567 results for 'working drawings'

Project

Fast-tracked projects

Published: 7 December 2011 | Edited: 22 June 2022

Read time: 7 minutes Fast-tracking (or phased construction/ early contractor involvement) is a generic term used to describe a number of ...

Environment

Mind the gap: predicted vs actual performance of green buildings

Published: 28 February 2011 | Edited: 3 September 2018

This note was reviewed in September 2018 and retained for legacy. This paper reviews the major North American and Australian sustainability rating ...

Login to download this note (PDF 872KB)
Environment

Design for adaptability – an introduction to the principles and basic strategies

Published: 28 February 2005 | Edited: 3 October 2018

This note was reviewed and approved for currency in October 2018, with qualification that some references and resources are now superseded. This note ...

Login to download this note (PDF 840KB)
Glossary Term

Latent condition

A physical condition on, underlying or adjacent to the site which a reasonable contractor would not have anticipated if the contractor had examined ...

Glossary Term

Separate contractor

Separate contractor A separate contractor is an individual or company who contracts with the owner to perform some aspect of the works under a ...

Project

Regulatory requirements

Published: 30 November 2011 | Edited: 29 July 2021

Read time: 1 minute There is a high level of regulatory consistency across Australia; however, states and territories can and do make their own ...

Environment

Sustainable metropolitan transport – design strategies

Published: 31 August 2006

This note outlines how architects can use the design of buildings to help create sustainable transport systems and a more vibrant public domain.

Login to download this note (PDF 186KB)
Glossary Term

On account

On account Payments made 'on account' are payments that are provisional as a partial advance payment to the final price. In the construction context ...

Practice

Indigenous cultural authorship and intellectual property

Published: 6 November 2024

Read time: 5 minutes The information below outlines the considerations to be taken when working with Indigenous Cultural and Intellectual Property ( ...

Environment

Planning for transit oriented development in Australian cities

Published: 30 November 2007

Transit oriented development is a way of redeveloping a city to reduce car dependence.  This paper outlines its basic tenets by examining four ...

Login to download this note (PDF 540KB)

Refine

Note Types
State / Region