Guide letter 24: Successful tenderer - request for information

Read time: 2 minutes

Guide letters provide advice about matters architects should consider when composing letters to the parties involved in architectural projects.

1. When and how?

1.1 After you have notified the successful tenderer of your client's acceptance (refer Guide letter 23) you should remind the successful tenderer that certain information (as set out in the specification) is required within a specific time (some can wait until soon after signing the contract; refer Guide letter 20).

1.2 You could (and sometimes should) combine this letter with Guide letter 23 and/or Guide letter 25.

1.3 You should write this letter before signing the contract. Some items of information can wait until just before commencement on site. You cannot fix a contract signing date until you have some of the required information (such as rates and percentages as noted below).

2. Content

Refer to:

  • specification clauses where information is required.

Advise:

  • which information is required prior to signing contract
  • when information is required
  • when information is required which can be supplied later.

Note The type of information required generally relates to:

  • insurance
  • bank security or guarantees
  • priced bill of quantities, where applicable
  • critical path analysis
  • construction schedule
  • cash flow
  • list of proposed subcontractors
  • name and contact details of senior personnel
  • rates and percentage allowances to be inserted in Schedules.

Note Some practitioners seek all of this information at tender time. You should advise your client before tenders are called about available alternatives, but it would be prudent to explain that difficulties may be encountered if too much information is sought as part of the tender.

3. Action

3.1 This is necessary to enable the contract to be finalised for execution.

4. What happens next?

4.1 You should check that the supplied information complies with the specification requirements, contract conditions and the tender.

4.2 Advise your client accordingly and ensure that agreement has been reached between your client and the successful tenderer on all outstanding matters.

5. Are there other possibilities?

5.1 You cannot prepare contract documents until 4.2 above has been fulfilled.

6. What can happen if you don't?

6.1 Failure to obtain this information can delay commencement of the work.

7. Copies

7.1 Architect's file

7.2 Client

7.3 Relevant specialist consultants

Disclaimer

This content is provided by the Australian Institute of Architects for reference purposes and as general guidance. It does not take into account specific circumstances and should not be relied on in that way. It is not legal, financial, insurance, or other advice and you should seek independent verification or advice before relying on this content in circumstances where loss or damage may result. The Institute endeavours to publish content that is accurate at the time it is published, but does not accept responsibility for content that may or has become inaccurate over time. Using this website and content is subject to the Acumen User Licence.

Was this note helpful?

We are always looking to improve our content and your opinion is important to us. If you have any feedback or suggestions on how this article could be more relevant and useful, please outline below.

Related Notes

Guide letter 20: Pre-tender information
Resources
20 December 2011
Guide letter 23: Successful tenderer - letter of acceptance
Resources
29 August 2012
Guide letter 25: Unsuccessful tenderers - advice
Resources
20 December 2011

Recently Viewed

As-built documentation
Project
24 January 2024
Business continuity and disaster planning
Practice
24 January 2024
Slip resistance design considerations
Project
14 December 2023
Slip resistance compliance and testing
Project
14 December 2023
Ecological connectivity design strategies
Environment
29 November 2023