101-110 of 218 results for 'release DRawings'
Read time: 8 minutes As part of the building permit/consent process, when carrying out building work on or near title boundaries certain state and ...
Read time: 9 minutes Safety in design provides a system to formally document a process demonstrating systematic risk management. This process ...
Read time: 4 minutes Many building projects involve work for tenants, and there is a wide range of variables affecting the architect's approach to ...
Read time: 5 minutes An expert witness is a witness with expertise in a particular field of study. The role of lay evidence in legal proceedings is ...
The access provisions of Premises Standards 2010 have been incorporated into NCC Volume 1 BCA, effective from 1 May 2011. In all public buildings, ...
The access provisions of Premises Standards 2010 have been incorporated into NCC Volume 1 BCA, effective from 1 May 2011. In all public buildings, ...
Architects are often asked to provide project file documents or to hand over their entire project file after completion of the works. Architects need ...
Permaculture - Part A - Introduction and urban farming
Published: 28 February 2010 | Edited: 28 November 2018This note was reviewed and approved for currency in November 2018. This paper is the first of a two part paper intended to introduce the concept of ...
Read time: 3 minutes Schedule 2 of the Architects Regulation 2017 under the Architects Act 2003 (New South Wales (NSW)) contains the NSW Architects ...
'Indoor air quality can be defined as the totality of attributes of indoor air that affect a person’s health and well being' (Department of ...