211-220 of 480 results for 'design brief'
Read time: 3 minutes Different methods of procuring buildings can be appropriate for some projects, but some detailed aspects of a particular ...
Read time: 11 minutes Welcome to the Jungle House (WTTJH) is a home designed to fit within the existing building’s reconstructed masonry fabric and ...
A practical guide to life cycle assessment of buildings
Published: 31 May 2012 | Edited: 4 September 2018This note was reviewed in September 2018 and retained for legacy. Life cycle assessment (LCA) is an internationally recognised and standardised ( ...
Building-integrated photovoltaics (BIPV)
Published: 31 July 2011 | Edited: 22 November 2018This note was reviewed and approved for currency in November 2018. This note deals with architectural issues associated with photovoltaic (PV) power ...
Building design and the selection of materials, appliances, equipment and technologies can all contribute to the minimisation of both operational and ...
This note was reviewed and retained for legacy in August 2018. This note discusses approaches to sustainable design in remote, rural and regional ...
A summary of urban assessment tools for application in Australia
Published: 29 February 2016 | Edited: 28 August 2018This note was reviewed and approved for currency in August 2018. With increasing world population, urbanization, and climatic changes impacting ...
Mind the gap: predicted vs actual performance of green buildings
Published: 28 February 2011 | Edited: 3 September 2018This note was reviewed in September 2018 and retained for legacy. This paper reviews the major North American and Australian sustainability rating ...
Read time: 1 minute It is essential to clearly identify the scope and responsibility of the specialist consultant/s for the lifecycle of the project, ...
Read time: 15 minutes Daramu House is a 7-storey mass timber commercial building located at Barangaroo, a 7.5 ha waterfront urban renewal project on ...