211-220 of 291 results for 'private job liability'

Environment

Site planning and design for bushfire

Published: 25 February 2021 | Edited: 19 June 2023

A summary update has been provided for this note in June 2023. This summary reflects updates to this topic on the National Construction Code 2022 ...

Download this note (PDF 2MB)
Environment

Mental landscapes – the forgotten element in sustainable design

Published: 30 November 2003 | Edited: 3 October 2018

This note was reviewed and approved for currency in October 2018. Built environments are an incarnation of our mental landscapes.  In Western culture ...

Download this note (PDF 474KB)
Environment

Chilled ceilings and beams

Published: 28 February 2006

Alternative low energy air-conditioning solutions are now being commonly used in preference to more traditional air-conditioning solutions for ...

Download this note (PDF 687KB)
Environment

Emerging technologies in ventilation

Published: 30 November 2002

Innovation in ventilation systems is becoming an increasingly popular and targeted topic of architectural discourse. Architects, consultants and ...

Download this note (PDF 2MB)
Project

Certificates

Published: 17 January 2017 | Edited: 22 July 2020

Under most standard-form building contracts the contractor receives regular payment for the work as it progresses. Progress certificates are issued ...

Project

When to engage a fire safety engineer

Published: 31 March 2022 | Edited: 20 October 2022

Read time: 9 minutes This note explains the role of a fire safety engineer (fire engineer) at various stages of a project and the value they can add ...

Environment

The climate-adaptive vernacular architecture of Asia-Pacific

Published: 31 May 2011 | Edited: 30 November 2018

This note was reviewed and approved for currency in November 2018. This note is based on research undertaken as part of a Churchill Fellowship, which ...

Download this note (PDF 3MB)
Project

Non-complying building products

Published: 4 June 2018 | Edited: 22 November 2023

Read time: 5 minutes Architects carry significant legal liability when selecting and specifying materials and products for the construction of a ...

Project

Contract administration versus supervision

Published: 15 November 2017 | Edited: 16 June 2022

Read time: 6 minutes Supervision of the works performed under a construction contract is generally the responsibility of the head contractor however, ...

Project

Shop drawings

Published: 18 January 2023

Read time: 5 minutes Shop drawings are ‘drawings prepared for a fabricator to use in a workshop’ (Standards Australia 2020). Common examples of shop ...

Refine

Note Types
State / Region