301-310 of 545 results for 'building approval'

Environment

Water

Published: 17 December 2018

Integrating measures for water management and conservation including the collection, treatment and reuse of water; water-sensitive urban design (WSUD ...

Project

Design considerations

Published: 23 January 2020

At the onset of a project and throughout the preliminary design phases, you should consider and investigate any factors and considerations that may ...

Project

Material considerations

Published: 23 January 2020

Familiarise yourself with material selections and construction methods that are incorporated in the design. Provide particular consideration to the ...

Environment

Timber and wood

Published: 26 November 2018

In their adaptiveness to new forms of construction and as a natural material option in biophilic design, timber and wood products continue to be a ...

Project

HIA Qld Alteration, Addition and Renovation

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA Victorian Alterations, Additions and Renovations

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...

Project

Fire safety engineering vs fire services engineering

Published: 31 March 2022

Read time: 7 minutes Fire safety engineering and fire services engineering are not the same discipline. This note explains the difference between ...

Practice

Queensland Code of conduct

Published: 13 July 2020 | Edited: 6 December 2023

Read time: 8 minutes The Architects Act 2002 (Qld) requires the Board of Architects of Queensland to make a code of practice to provide guidance to ...

Project

Selection and engagement

Published: 18 January 2012 | Edited: 25 November 2021

Read time: 2 minutes In the early stages of the project (often as part of the architect's initial proposal to the prospective client), the architect ...

Project

ABIC contracts – Tasmania

Published: 20 August 2018 | Edited: 19 August 2020

The 2018 revised editions of the Australian Building Industry Contracts (ABIC) Major Works (MW), Simple Works (SW) commercial and domestic are ...

Refine

Note Types
State / Region