331-340 of 536 results for 'Construction contract'
Read time: 18 minutes There are times when architects and architectural firms come together to collaborate or form joint ventures to work together.
Passivhaus: a pathway to low energy buildings in Australasia
Published: 31 May 2017 | Edited: 7 October 2018This note was reviewed and approved for currency in October 2018. The Passivhaus, or Passive House, standard is a rigorous, voluntary and ...
Access guides for best practice and inclusive design
Published: 7 January 2020 | Edited: 23 October 2024Read time: 1 minute The Disability Discrimination Act 1992 (DDA) is an all embracing complaints based legislation that extends beyond the parts of ...
During the design development (developed design) phase, develop the approved concept design and provide documentation to explain it to the client; ...
This paper was first published in the Australian Journal of Water Resources, and is reprinted with the kind permission of Engineers Australia. This ...
Client information notes have been prepared as a resource to assist architects to help their clients or potential clients understand some of the ...
This note was reviewed and approved for currency in November 2018. Life cycle energy analysis (LCEA) is a method of assessing both the operational ...
James Street Market, Brisbane – a subtropical retail case study
Published: 30 September 2010 | Edited: 3 October 2018This note was reviewed and approved for currency in October 2018. In the Australian subtropics, high rainfall, warm weather and humidity present ...
The Building Act 2016 (Tas) (the Act) and the Building Regulations 2016 (the Regulations) are the main pieces of legislation that regulate building, ...
This note, originally published in August 2000, was reviewed by Dr Graham Treloar in June 2005. This summary page includes recent updates to the ...