481-490 of 758 results
Santos Headquarters, Adelaide – 5 Star Green Star CBD Office Tower
Published: 31 May 2008Santos Headquarters was the first building in South Australia to achieve both the 5 Star Green Star Office Design and the 5 Star Green Star Office ...
Office building retrofit at 55 St Andrews Place, Melbourne – Turning a Sparrow into a Peacock
Published: 31 August 2008This note was reviewed in September 2018 and has been retained for legacy. This article describes the upgrade of an existing government building, 55 ...
Read time: 15 minutes Daramu House is a 7-storey mass timber commercial building located at Barangaroo, a 7.5 ha waterfront urban renewal project on ...
Project time management in design and documentation
Published: 24 February 2021 | Edited: 7 December 2023Read time: 6 minutes (This note replaces Time allowances - delays in design and documentation) Project time management is a core aspect of an ...
Read time: 1 minute Sometimes architects enter into forms of engagement that differ from standard Institute Client and Architect Agreements where ...
Read time: 8 minutes To enable an architect to monitor the contractor's performance, the contract documents require the contractor to submit a ...
Read time: 4 minutes In Construction Industry Terminology (Standen, 2000), float is: the measure of predicted free time in a [program] between ...
Before practical completion If the work is to be carried out before practical completion of the main building contract (that is, the building ...
The role of the fire safety engineer in the design team
Published: 31 March 2022 | Edited: 20 October 2022Read time: 4 minutes Since the inception of modern performance-based fire engineering, the fire safety engineer (fire engineer) has become an ...
Read time: 8 minutes Many of the Deemed-to-Satisfy (DtS) Provisions in the National Construction Code (NCC) are driven by the fire safety objectives ...