71-80 of 218 results for 'release DRawings'

Project

Errors and omissions

Published: 3 September 2018

In practice, you may find that clients or contractors assume that when errors, ambiguities or omissions in the architect’s documentation result in ...

Practice

Office administration and manual structure

Published: 5 February 2020 | Edited: 27 September 2023

Read time: 5 minutes Implementing appropriate administration systems in an architectural practice provides the basis for an efficient and profitable ...

Project

Waterproofing

Published: 17 November 2021 | Edited: 21 November 2022

Read time: 2 minutes Water penetration into buildings continues to be a significant issue for architects and their professional indemnity insurers.

Resources

Drinking fountains and water filling points

Published: 13 February 2017

1.    APPLICATION Provide accessible drinking fountains where required. 2.    DESIGN CONSIDERATIONS The Design Guide contains criteria for elements ...

Project

Architect's liability for specialist consultants

Published: 20 June 2024

This note replaces its previous version published 7 July 2012. Read time: 9 minutes Architects should be aware of the extent of their potential ...

Project

Contract administration versus supervision

Published: 15 November 2017 | Edited: 16 June 2022

Read time: 6 minutes Supervision of the works performed under a construction contract is generally the responsibility of the head contractor however, ...

Practice

Gender equity

Published: 22 January 2018 | Edited: 3 August 2022

Read time: 7 minutes The participation rate and progression of women within the architectural profession is disproportionately low compared to the ...

Environment

Phase change materials – overview

Published: 31 August 2006 | Edited: 30 August 2018

This note was reviewed in August 2018 and retained for legacy. This paper introduces phase change materials (PCMs) as an alternative energy storage ...

Download this note (PDF 373KB)
Environment

Winning hearts and minds: the role of emotion and logic in sustainable design decision making

Published: 31 August 2014 | Edited: 29 August 2018

This note was reviewed and approved for currency in August 2018. Tougher economic times have led to an increasing scrutiny of sustainability ...

Download this note (PDF 1MB)

This note discusses the difficulties currently being experienced in implementing Ecologically Sustainable Development (ESD) from a development ...

Download this note (PDF 303KB)

Refine

Note Types
State / Region