81-90 of 545 results for 'building approval'

Environment

Site planning and design for bushfire

Published: 25 February 2021 | Edited: 19 June 2023

A summary update has been provided for this note in June 2023. This summary reflects updates to this topic on the National Construction Code 2022 ...

Login to download this note (PDF 2MB)
Glossary Term

hold points

hold points Usually defined as an opportunity to witness an activity or item for which the contractor is required to give notice. The contractor ...

This note, originally published in 1997, was reviewed by John Gelder in October 2002. This Note reviews a number of issues which arise out of ...

Login to download this note (PDF 533KB)
Resources

Guide letter 13: Advice to client on authority conditions

Published: 20 December 2011 | Edited: 28 July 2021

Guide letters provide advice about matters architects should consider when composing letters to the parties involved in architectural projects. 1.

Environment

Thermal mass and insulation for temperate climates

Published: 30 November 2010 | Edited: 24 August 2018

This note was reviewed and approved for currency in August 2018. Insulation and thermal mass are highly effective ways to reduce energy use and ...

Login to download this note (PDF 1MB)
Environment

Life cycle energy analysis

Published: 31 March 2012 | Edited: 2 November 2018

This note was reviewed and approved for currency in November 2018. Life cycle energy analysis (LCEA) is a method of assessing both the operational ...

Login to download this note (PDF 1MB)
Resources

Client note: Architects' fees

Published: 5 July 2017 | Edited: 10 March 2022

Read time: 7 minutes Architect’s fees are a matter for negotiation: there is no standard basis for calculation. The fee will reflect the degree of ...

Glossary Term

Hold point

Hold point Usually defined as an opportunity to witness an activity or item for which the contractor is required to give notice. The contractor must ...

Glossary Term

Hold point

Hold point Usually defined as an opportunity to witness an activity or item for which the contractor is required to give notice. The contractor must ...

Environment

Green roofs for energy efficiency – a simulation study in Australian climates

Published: 30 November 2016 | Edited: 21 August 2018

This note was reviewed and approved for currency in August 2018.  This paper describes how green roofs influence the energy performance of a ...

Login to download this note (PDF 4MB)

Refine

Note Types
State / Region