21-30 of 81 results for 'release DRawings'
Permaculture - Part B - Principles and application
Published: 28 February 2010 | Edited: 28 November 2018This note was reviewed and approved for currency in November 2018. This paper is the second part of a two part paper intended to introduce the concept of permaculture and urban farming to built environment professionals. These papers seek to ...
Airtightness and thermal bridging in buildings
Published: 6 October 2021 | Edited: 20 March 2024Read time: 29 minutes All buildings should provide a durable enclosure, thermally comfortable interior, good indoor air quality and energy-efficient operation. These measures can largely be met through an airtight building envelope with adequate ...
This note was reviewed and retained for legacy in August 2018. This note discusses approaches to sustainable design in remote, rural and regional areas. Based on the author's experiences in the Top End, it recommends approaches to managing a project ...
Santos Headquarters, Adelaide – 5 Star Green Star CBD Office Tower
Published: 31 May 2008Santos Headquarters was the first building in South Australia to achieve both the 5 Star Green Star Office Design and the 5 Star Green Star Office As-Built certified ratings. It also achieved a 4.5 Star Australian Building Greenhouse Rating and has ...
Office building retrofit at 55 St Andrews Place, Melbourne – Turning a Sparrow into a Peacock
Published: 31 August 2008This note was reviewed in September 2018 and has been retained for legacy. This article describes the upgrade of an existing government building, 55 St Andrews Place in Melbourne’s Treasury Reserve, utilising an unconventional design process and ...
Building T at Deakin University, Burwood in Victoria was designed by DesignInc. The development, located in Melbourne's eastern suburbs, utilises thermal mass and hybrid ventilation systems. This case study provides a detailed evaluation of the ...
This note, was originally published in May, 2000. It was reviewed by John Greenwood in March, 2005. The summary page includes recent updates to the topic since publication. The material in this Note is based on content from Under Cover: Guidelines ...
Design for eco-services – Part B building services
Published: 30 November 2009 | Edited: 5 September 2018This note was reviewed and approved for currency by the Author in September 2018. Without the virtually free services of nature like clean air and water, humans would not last long. Natural systems can be incorporated in existing urban structures or ...
This note highlights some of the fundamental concepts that underpin biophilic design and introduces designers to some basic principles and tools that can help develop relevant capabilities within practices to create environments that truly connect ...
The operational stage of a building accounts for up to 65 per cent of the life cycle cost. However the ability of the Facility Manager to deliver a high performance building environment is largely governed by the initial design, construction and ...