201-210 of 216 results
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
Read time: 8 minutes As part of the building permit/consent process, when carrying out building work on or near title boundaries certain state and ...
The role of the fire safety engineer in the design team
Published: 31 March 2022 | Edited: 20 October 2022Read time: 4 minutes Since the inception of modern performance-based fire engineering, the fire safety engineer (fire engineer) has become an ...
Read time: 7 minutes Fire safety engineering and fire services engineering are not the same discipline. This note explains the difference between ...
Read time: 9 minutes This note explains the role of a fire safety engineer (fire engineer) at various stages of a project and the value they can add ...
Read time: 4 minutes Public Private Partnership (PPP) is a contract between the public and the private sector where the government pays the private ...
Read time: 3 minutes Co-design in the built environment is more than consultation – it involves having equal seats at the table for consumers, ...
Read time: 8 minutes Many of the Deemed-to-Satisfy (DtS) Provisions in the National Construction Code (NCC) are driven by the fire safety objectives ...
Read time: 1 minute It is essential to clearly identify the scope and responsibility of the specialist consultant/s for the lifecycle of the project, ...