Contingency sum

Published: 9 January 2013 | Edited: 28 October 2020

A contingency sum is an amount of money, usually expressed as a percentage, included in the project budget to allow for the unknown or unresolved ...

Project

Contaminated land investigation

Published: 25 November 2011 | Edited: 26 October 2022

Read time: 5 minutes Contaminated land can result from many historical and ongoing activities. Land may have become contaminated by actions in the ...

Project

HIA Qld Alteration, Addition and Renovation

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA WA Lump Sum Alterations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

Design workshops (charrette)

Published: 3 October 2017 | Edited: 21 November 2022

Read time: 2 minutes A design workshop, or more accurately a design charrette, draws together the architect and the principal members of the design ...

Project

Prime cost items and provisional sums

Published: 24 November 2011 | Edited: 14 September 2020

Most building contracts include provision for prime cost items and provisional sums. A prime cost item is an allowance in the contract for the supply ...

Project

Liability for manufactured products

Published: 29 April 2020 | Edited: 25 January 2024

Read time: 8 minutes By far the greater part of modern buildings is made up of manufactured products, eg bricks, steel, paint, sanitary fittings, ...

Project

Non-complying building products

Published: 4 June 2018 | Edited: 22 November 2023

Read time: 5 minutes Architects carry significant legal liability when selecting and specifying materials and products for the construction of a ...

Project

HIA NSW Residential Renovations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA Victorian Alterations, Additions and Renovations

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...

Refine

State / Region