111-120 of 215 results for 'form of insurance'

Project

HIA NT Residential Alterations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA SA Alterations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

Waterproofing

Published: 17 November 2021 | Edited: 21 November 2022

Read time: 2 minutes Water penetration into buildings continues to be a significant issue for architects and their professional indemnity insurers.

Project

Managing time during construction

Published: 22 May 2020 | Edited: 20 December 2023

Read time: 8 minutes  To enable an architect to monitor the contractor's performance, the contract documents require the contractor to submit a ...

Project

Performance Solutions in fire engineering

Published: 8 February 2023

Read time: 8 minutes Many of the Deemed-to-Satisfy (DtS) Provisions in the National Construction Code (NCC) are driven by the fire safety objectives ...

Project

HIA ACT Residential Alterations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA Victorian Alterations, Additions and Renovations

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...

Project

HIA NSW Residential Renovations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA Qld Alteration, Addition and Renovation

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Project

HIA WA Lump Sum Alterations and Additions

Published: 8 December 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where:  the bank ...

Refine

State / Region