121-130 of 140 results for 'design brief'

Project

Building contract - execution

Published: 18 May 2023 | Edited: 12 August 2024

Read time: 5 minutes  Once the contractor has been selected the architect must prepare the contract for execution (signing). The owner and the ...

Project

Time records

Published: 27 January 2012 | Edited: 12 October 2023

Read time: 5 minutes In order to calculate project costs, staff costs and charge-out rates, accurate knowledge is required of the way in which time ...

Project

As-built documentation

Published: 24 January 2024

Read time: 9 minutes As-built documentation captures the finished state of a project completed in accordance with the contract. It may include ...

Project

Inspections

Published: 18 May 2022 | Edited: 8 November 2023

Read time: 8 minutes Inspection is an area of architects' work that can give rise to a significant number of claims for professional negligence. It ...

Project

Contract administration versus supervision

Published: 15 November 2017 | Edited: 16 June 2022

Read time: 6 minutes Supervision of the works performed under a construction contract is generally the responsibility of the head contractor however, ...

Project

Measurement of buildings

Published: 24 November 2011 | Edited: 23 November 2020

The building industry – including quantity surveyors, building owners and planning authorities – uses a variety of methods for measuring building ...

Project

ABIC contracts – Tasmania

Published: 20 August 2018 | Edited: 19 August 2020

The 2018 revised editions of the Australian Building Industry Contracts (ABIC) Major Works (MW), Simple Works (SW) commercial and domestic are ...

Project

Contaminated land

Published: 2 October 2017 | Edited: 27 October 2022

Read time: 15 minutes Contaminated land contains substances that may pose a risk to human health or the environment. Owners have a responsibility to ...

Project

Prevention Principle and the implied duty of cooperation

Published: 28 August 2015 | Edited: 9 June 2021

An architect responsible for the administration of a construction contract should be aware of two legal concepts enforced by the courts. The first is ...

Project

Guaranteed maximum price

Published: 24 August 2022

Read time: 4 minutes Guaranteed maximum price (GMP) contracts provide an alternative pricing model to the more traditional fixed price (or 'lump sum’ ...

Refine

State / Region