131-140 of 216 results

Project

Project time management in design and documentation

Published: 24 February 2021 | Edited: 7 December 2023

Read time: 6 minutes (This note replaces Time allowances - delays in design and documentation) Project time management is a core aspect of an ...

Project

Time performance warranties

Published: 15 July 2020 | Edited: 7 December 2023

Read time: 1 minute Sometimes architects enter into forms of engagement that differ from standard Institute Client and Architect Agreements where ...

Project

Managing time during construction

Published: 22 May 2020 | Edited: 20 December 2023

Read time: 8 minutes  To enable an architect to monitor the contractor's performance, the contract documents require the contractor to submit a ...

Project

Float – adjustment of time

Published: 22 May 2020 | Edited: 7 December 2023

Read time: 4 minutes In Construction Industry Terminology (Standen, 2000), float is: the measure of predicted free time in a [program] between ...

Project

Commissioning tenancy works

Published: 22 November 2011

Before practical completion If the work is to be carried out before practical completion of the main building contract (that is, the building ...

Project

The role of the fire safety engineer in the design team

Published: 31 March 2022 | Edited: 20 October 2022

Read time: 4 minutes Since the inception of modern performance-based fire engineering, the fire safety engineer (fire engineer) has become an ...

Project

Performance Solutions in fire engineering

Published: 8 February 2023

Read time: 8 minutes Many of the Deemed-to-Satisfy (DtS) Provisions in the National Construction Code (NCC) are driven by the fire safety objectives ...

Project

AS 4122

Published: 19 April 2017 | Edited: 12 January 2023

Read time: 10 minutes This note covers the two most recent versions of the Australian Standard Consultancy Agreement: AS 4122-2010 and its ...

Project

Client Architect Agreement (CAA2019)

Published: 29 May 2019

Read time: 12 minutes The Institute’s 2019 Client Architect Agreement (CAA2019) can be used for design and building projects of various sizes and ...

Project

National Construction Code (NCC)

Published: 29 August 2019 | Edited: 19 April 2023

Read time: 4 minutes The National Construction Code (NCC) is written and maintained by the Australian Building Codes Board (ABCB) on behalf of the ...

Refine

State / Region