Read time: 7 minutes Clients seek a variety of methods to select an architect. Accepting a commission requires careful consideration and ...
Read time: 17 minutes The specification is a written description of the required quality of the built product and its component elements. It is an ...
The Building Act 2016 (Tas) (the Act) and the Building Regulations 2016 (the Regulations) are the main pieces of legislation that regulate building, ...
Read time: 12 minutes The Australian Institute of Architects’ (the Institute) 2024 Client Architect Agreement (CAA2024) can be used for design and ...
With the development of digital technology and the availability of the internet, architects and their specialist consultants can satisfy themselves ...
Read time: 7 minutes Fast-tracking (or phased construction/ early contractor involvement) is a generic term used to describe a number of ...
Read time: 8 minutes Many of the Deemed-to-Satisfy (DtS) Provisions in the National Construction Code (NCC) are driven by the fire safety objectives ...
Read time: 9 minutes In recent years there has been an increase in government- and client-generated contracts that have introduced direct or indirect ...
Read time: 9 minutes This note explains the role of a fire safety engineer (fire engineer) at various stages of a project and the value they can add ...
Read time: 12 minutes The Institute’s 2019 Client Architect Agreement (CAA2019) can be used for design and building projects of various sizes and ...