41-50 of 216 results
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, where: the bank or financier ...
The building industry – including quantity surveyors, building owners and planning authorities – uses a variety of methods for measuring building ...
When the project involves a series of handover stages for separable parts of the building work or some form of staged practical completion, ...
Read time: 2 minutes The construction program is generally a requirement of the contract but should not form part of the contract documentation.
Read time: 7 minutes Fire safety engineering and fire services engineering are not the same discipline. This note explains the difference between ...
Read time: 9 minutes This note explains the role of a fire safety engineer (fire engineer) at various stages of a project and the value they can add ...
Warranties in client and architect agreements
Published: 26 September 2019 | Edited: 2 March 2023Read time: 2 minutes A warranty is the contractual promise that certain things will be done or achieved, expressed in such certain and definite terms ...
A collateral warranty is a contract which gives a third party collateral, or running side by side, rights in an existing contract entered into by two ...