81-90 of 140 results for 'design brief'

Project

Regulatory requirements

Published: 30 November 2011 | Edited: 29 July 2021

Read time: 1 minute There is a high level of regulatory consistency across Australia; however, states and territories can and do make their own ...

Project

Termite management

Published: 29 November 2011 | Edited: 1 May 2023

Read time: 3 minutes A termite management system is a requirement under the National Construction Code (NCC) Volume Two in locations ‘where ...

Project

Budget estimates – influencing factors

Published: 24 November 2011 | Edited: 6 October 2021

Read time: 3 minutes The project budget estimate will be influenced by a wide range of factors, some of which are within the architect's control, and ...

Project

National Construction Code (NCC)

Published: 29 August 2019 | Edited: 19 April 2023

Read time: 4 minutes The National Construction Code (NCC) is written and maintained by the Australian Building Codes Board (ABCB) on behalf of the ...

Project

Budget estimates – terminology

Published: 24 November 2011 | Edited: 6 October 2021

Read time: 3 minutes Terms used in the process of estimating project budgets should not be confused with similar terminology used by government or by ...

Project

Waterproofing

Published: 17 November 2021 | Edited: 21 November 2022

Read time: 2 minutes Water penetration into buildings continues to be a significant issue for architects and their professional indemnity insurers.

Project

Project bid

Published: 15 November 2017 | Edited: 22 June 2020

A project bid may be in response to an invitation or advertisement and the proposal should respond to any stated selection criteria, include an ...

Project

Special Conditions for HIA New Homes Contracts

Published: 24 September 2020

These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, where: the bank or financier ...

Project

Noise from building sites

Published: 30 November 2011

During the process of building, it is common for substantial noise to emanate from the building site. Personnel should be informed about the need to ...

Project

Digital transfer considerations

Published: 4 August 2016 | Edited: 23 November 2020

Read time: 2 minutes The transfer of digital documents to other parties can occur via a variety of methods including: email physical removable media ...