Read time: 15 minutes Contaminated land contains substances that may pose a risk to human health or the environment. Owners have a responsibility to ...
Read time: 11 minutes An increasing number of large projects are now being delivered under novated agreements – a common method of construction ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, where: the bank or financier ...
Read time: 7 minutes Fire safety engineering and fire services engineering are not the same discipline. This note explains the difference between ...
These Special Conditions have been prepared for use by the builder and the owner, as an alternative form of contract, for situations where: the bank ...
A contingency sum is an amount of money, usually expressed as a percentage, included in the project budget to allow for the unknown or unresolved ...
Read time: 5 minutes Shop drawings are ‘drawings prepared for a fabricator to use in a workshop’ (Standards Australia 2020). Common examples of shop ...
Read time: 3 minutes It is important that the architect informs the client at each stage of its commission and at any time when the architect becomes ...
Unconditional guarantees and cash retention
Published: 10 January 2013 | Edited: 20 May 2020Most standard-form building contracts allow the security to be in the form of cash retention or a bank guarantee. Under ABIC contracts, there is a ...