This article describes the upgrade of an existing government building, 55 St Andrews Place in Melbourne’s Treasury Reserve, utilising an unconventional design process and with a strong emphasis on integrated design from the outset.

The aim of the project was to transform a poorly performing building, from both an energy efficiency and indoor environment quality perspective, into a building that meets current best practice for greener office spaces. The building is owned and occupied by the Victorian Government.

Two of the buildings, 1 Treasury Place and 1 Macarthur Street, commenced construction from 1963, while 3-5 Macarthur Street (later renamed 55 St Andrews Place) was constructed as a four-storey building in 1967.

note summary
  1. Project details
  2. Introduction
  3. History of the building
  4. Victorian government accommodation standards
  5. Problems
  6. Developing a building improvement plan
  7. Implementing the improvements
  8. Design process
  9. Overview of green building initiatives
  10. Construction
  11. Performance
  12. Conclusion
Download the full note PDF 3MB
Download
Disclaimer

This content is provided by the Australian Institute of Architects for reference purposes and as general guidance. It does not take into account specific circumstances and should not be relied on in that way. It is not legal, financial, insurance, or other advice and you should seek independent verification or advice before relying on this content in circumstances where loss or damage may result. The Institute endeavours to publish content that is accurate at the time it is published, but does not accept responsibility for content that may or has become inaccurate over time. Using this website and content is subject to the Acumen User Licence.

Was this note helpful?

We are always looking to improve our content and your opinion is important to us. If you have any feedback or suggestions on how this article could be more relevant and useful, please outline below.

Recently Viewed

Bay Pavilions Arts + Aquatic
Environment
24 April 2024
As-built documentation
Project
24 January 2024
Business continuity and disaster planning
Practice
24 January 2024
Slip resistance design considerations
Project
14 December 2023
Systems thinking
Environment
17 December 2018