Santos Headquarters, Adelaide – 5 Star Green Star CBD Office Tower

Santos Headquarters was the first building in South Australia to achieve both the 5 Star Green Star Office Design and the 5 Star Green Star Office As-Built certified ratings. It also achieved a 4.5 Star Australian Building Greenhouse Rating and has become a highly regarded work environment by its occupants. In this paper the architects and services engineers provide a review of the design process, the passive and active design elements, the challenges, positive outcomes and lessons learnt.

note summary
  1. Introduction
  2. Team structure
  3. Response
  4. Outcomes
  5. Conclusion
Download the full note PDF 769KB
Download
Disclaimer

This content is provided by the Australian Institute of Architects for reference purposes and as general guidance. It does not take into account specific circumstances and should not be relied on in that way. It is not legal, financial, insurance, or other advice and you should seek independent verification or advice before relying on this content in circumstances where loss or damage may result. The Institute endeavours to publish content that is accurate at the time it is published, but does not accept responsibility for content that may or has become inaccurate over time. Using this website and content is subject to the Acumen User Licence.

Was this note helpful?

We are always looking to improve our content and your opinion is important to us. If you have any feedback or suggestions on how this article could be more relevant and useful, please outline below.

Recently Viewed

Bay Pavilions Arts + Aquatic
Environment
24 April 2024
As-built documentation
Project
24 January 2024
Business continuity and disaster planning
Practice
24 January 2024
Life cycle assessment (LCA)
Environment
17 December 2018
Slip resistance compliance and testing
Project
14 December 2023